Category Archives: Manufacturing Plant

Cobourg, ON, Canada – Sprinkler system activates in fire at wood pallet manufacturer; No injuries to workers

All staff got out safely after a fire started in a grinder machine at Canada Pallet Friday evening. Cobourg Fire was called to the plant on Division Street in Cobourg after 6 p.m. on Friday, Jan. 23 after the machine overheated and started a fire, said Fire Captain Scott MacDonald. The flames set off the sprinkler system, he said.

 Night supervisor Cathy MacLean said she saw the flames and ran over to shut off power to the machine. She made sure everyone was out of the building, a staff of about 40 to 50 people. “Thank God everyone is out safe,” she said.

Las Cruces, NM – Sprinklers keep fire in check at manufacturing facility

Firefighters were dispatched just after 10:00 a.m. to Alaska Structures located in the 300-block of Rea Boulevard. Calls to 911 reported a fire inside the large manufacturing facility.

The first arriving fire unit reported heavy smoke coming from the building and an active fire in an oven used for molding plastics. Firefighters were able to attack the fire and quickly extinguish it within minutes. The fire crews contained the blaze to the oven and minimized damage to the building’s interior. Investigators also credit the facilities sprinkler system for keeping the fire in check prior to the arrival of the fire department.

Hastings, MN – Sprinklers make the difference in challenging fire at container manufacturer

All employees evacuated safely after a fire at Twin City Container in Hastings Thursday afternoon. The fire activated the building’s sprinkler system, which helped firefighters control the blaze. “The sprinkler system made a big difference in the result of this fire,” Schutt said.

The thick black smoke was caused by some of the products within the building.  “Any time you have anything petroleum or oil based you’re going to get that thick black smoke,” Schutt said.

Due to the intensity of the fire and smoke, firefighters took a defensive strategy at first, fighting the fire from the outside. Firefighters were lifted to the structure’s roof, where they created a vent hole, while the fire was fought on the ground. Once the fire was under control, crews moved inside to finish the work.

Twin City Container takes 55-gallon drums and tanker trucks and cleans them for reuse. Hastings utility crews inspected the sanitary sewer system to make sure none of the hazardous materials on site made it into the sewer system. No hazards were found, Schutt said.

An area of origin has been identified, but Schutt said the exact cause of the fire is still under investigation. He said the fire was located in the center of the largest part of the building and spread through the exhaust ductwork.

McAlester, OK – Fire contained by sprinkler system at plastics manufacturing business

The Krebs Volunteer Fire Department also responded to a second fire was at Berry Plastics, 349 Taylor Industrial Park Road.  A fire broke out in a printing press at the business.

“I don’t know exactly how it started,” Brewer said. “The fire was contained to one of their printing presses. There were no injuries that we know of. The sprinkler system activated and our fire crews made sure everything else was extinguished.”

San Leandro, CA – Sprinkler contains fire at manufacturer of shielding materials

The fire was reported around 7:45 p.m. at Nelco, a lead shielding manufacturer at 1840 Williams St., according to the Alameda County Fire Department.

Firefighters found heavy smoke coming from the building and called a second alarm. The fire was contained within 30 to 40 minutes, and fire damage was limited to the area of origin, due to operation of a sprinkler head.

Firefighters had difficulty entering the building due to security modifications.  No injuries were reported.

Greenville, MI – Fire at plastics compounding business quickly extinguished with help from sprinkler system

Firefighters from the Greenville Department of Public Safety responded at 5:20 p.m. Thursday to a structure fire at West Michigan Compounding, located at 1300 Moore St. in Greenville.

According to Greenville Department of Public Safety Sgt. Brian Blomstrom, during routine cleaning, a hot ember escaped into the ventilation system, starting a fire that was quickly extinguished due to a combination of the company’s sprinkler system and a quick response time from fire fighters. No one was injured.

Anderson, SC – Ductwork fire at manufacturing plant contained by sprinkler system

Officials responded to a fire at a new plant in Anderson County on Wednesday night. The plant’s state-of-the-art sprinkler system contained the fire to the ducts and fire crews were able to extinguish the blaze.

According to dispatchers, several fire departments were on the scene at First Quality Tissue on Masters Boulevard. First Quality produces ultra-premium towel and bath tissue products. Firefighters said they received the call about the flames at 7:30 p.m. and when they arrived on scene, smoke was coming out of the top of the building. Employees working in the building were evacuated. After the fire was out, fire crews allowed First Quality employees to return to the building. Officials said no one was injured in the fire.

Cleveland, OH – Fire at large commercial business extinguished by sprinkler system, Damage minimized

Cleveland Firefighters rushed to battle a blaze at InterGroup International on Wednesday morning. By the time crews arrived, the sprinkler system had already extinguished the fire.

Officials say the fire started around 5:30 a.m. as a worker was testing material to be recycled. The business is a shipping and receiving company that buys, reprocesses and sells post-industrial scrap plastics. The business is located in the 14500 block of Darley Avenue on the city’s east side.

Owner Neil Gloger says only two employees were inside at the time and evacuated safely. Gloger says there was no building damage but minor damage to supplies. He says they feel fortunate about the outcome and the business was able to reopen within two hours of the incident.

South Plainfield, NJ – Fire at plastics manufacturer controlled with help from sprinkler system

Veerag Mehta, an official with Polymer Dynamix, said that a dust collector outside of the building caught fire this morning, which caused an explosion through ventilation ducts.  Nobody was seriously hurt, but several people had ringing in their ears and they’re being checked for concussions, Mehta said.

The company does not know why the dust collector caught fire and exploded. The explosion — limited, because of sprinkler systems in the ducts — sent a plume of dust through part of the building, covering several workers, Mehta said.

“Knock on wood, everyone seems to be OK,” Mehta said.

Automatic sprinkler contains fire at Mercury Marine plant (Fond du Lac, WI)

No one was hurt and damage was minor in a fire at Mercury Marine Monday afternoon. The Fond du Lac Fire Department responded to the call at 2:36 p.m. Upon arrival, crews learned the fire started in Plant 98 in a dust collector. The automatic fire sprinkler activated and contained and extinguished the fire. “The fire suppression system worked as designed and kept the fire contained to the dust collector” said, Fond du Lac Fire Chief Peter O’Leary.